2014 Latest 100% Pass Guaranteed HP HP0-J64 Dumps (11-20)

2014 Latest 100% Pass Guaranteed HP HP0-J64 Dumps (11-20)

QUESTION 11
A customer storage infrastructure consists of eight HP StoreVirtual 4000 nodes in a cluster, connected to an HP 2910-24G al network environment.
Server virtualization is done using VMware vSphere 5.1 on six hosts across two sites.
Which drawbacks must the customer consider when upgrading the solution? (Select two.)

A.    When adding more nodes in the cluster, additional 1Gb network ports have to be added in each node.
B.    When using more than eight nodes in a cluster, a 10 Gb connection is recommended.
C.    When upgrading to VMware version 5.1, the iSCSI multipathing driver has to be configured.
D.    When using a server across the sites, VMware Site Recovery Manager is needed.
E.    When using 10 Gb, the customer has to implement new network switches.

Answer: AB

QUESTION 12
A customer plains to replace their storage array with an HP 3PAR StoreServ 10800 Storage System. This array stores sensitive data and must be highly available. The solution must comply with all legal requirements for securing sensitive data.
Which level of service you recommend for the new HP 3PAR StoreServ array?

A.    Support Plus 24
B.    SupportPlus 24 with Data Media Retention
C.    Proactive 24 with 6-hour CTR
D.    Critical Service with Data Media Retention

Answer: C

QUESTION 13
Refer to the exhibit. The customer wants to implement an HP StoreVirtual solution for the environment shown. The storage requirements dictate that the solution must have four nodes per site. What needs to be considered when designing the solution?

image

A.    the latency on the link
B.    a failover manager required on both sites
C.    200 MB/s bandwidth per storage nodes pair required
D.    the type of data being replicated

Answer: B

QUESTION 14
B-series switches with Access Gateway mode enabled provide connectivity to other switches that support which feature?

A.    VSAN
B.    NPIV
C.    FCIP
D.    LSAN

Answer: B

QUESTION 15
During a customer proposal meeting for a 900 TB HP 3PAR StoreServ 10800, you discover an opportunity to address the lack of disaster recovery for two very critical applications that both require approximately 90 TB of usable storage each. The customer is considering a competitive disaster recovery (DR) solution to meet this requirement in a more cost-efficient manner than a second array.
Which HP 3PAR StoreServ architectural feature should you position to address this customer need?

A.    Specify an HP 3PAR StoreServ Synchronous Long Distance configuration utilizing an HP 3PAR
StoreServ7200 synchronous configuration for the bestpossible RPO and RTO.
B.    Highlight the benefits of the HP 3PAR unified architecture and propose a minimally-configured HP
3PARStoreServ 7200 to provide a cost-effective disasterrecovery (DR) solution.
C.    Propose an HP 3PAR StoreServ solution that highlights the benefits of duplicated storage.
D.    Propose a second HP 3PAR StoreServ 10400 with a 250 TB replication license to cost- effectively
meet thedisaster recovery (DR) requirement.

Answer: A

QUESTION 16
An IT Operations Director of a large investment bank requests a meeting with the HP Account Manager and the Solution Architect. During the meeting, the IT Operations Director reports that there will be a 10% reduction in the investment bank’s operations staff, which currently provides help-desk services and first level technical support for 400 U.S. customer banks.
HP Professional Services provides support for the investment bank’s New York and San Francisco data centers, which have HP 3PAR StoreServ 10000 Storage Systems attached to HPUX-based HP Integrity Superdomes. The investment bank’s 400 customer bank use HP EVA P6400 storage attached to an HP BladeSystems with Virtual Connect FlexFabric. Now, the investment bank needs to add proactive monitoring and analysis What should the HP Account Manager and Solution Architect do to help the IT Operations Director address these challenges? (Select two.)

A.    Discuss the business benefits of the existing HP EVA 6400 install base using HP Insight Remote
SupportAdvanced.
B.    Demonstrate the value of HP’s Mission Critical Advantage Services.
C.    Prepare HP Consulting Services to evaluate the investment bank data center SAN monitoring and
firmwaremanagement environment.
D.    Modify the management framework of the investment bank data center infrastructure with HP SystemsInsight
Manager and HP Insight Remote SupportStandard.
E.    Recommend the placement of the HP EVA 6400 with the HP 3PAR StoreServ 12000 Storage System.

Answer: AD

QUESTION 17
A customer requires a storage solution with the ability to easily align data placement within appropriate array tiers in order to reduce costs. Which description of HP 3PAR StoreServ Dynamic Optimization capabilities is accurate for this customer?

A.    non-disruptive conversion from frequently-accessed data in a fully provisioned storage tier to a thinly
provisionedstorage tier
B.    autonomic RAID-level alignment for all busy volumes after array capacity or controller upgrades
C.    automatic placement based on volume access patterns, tier capacity settings, and pre- determined
optimization schedules
D.    user-initiated volume migration to the best tier, based on application needs or historical array performance
analysis

Answer: A

QUESTION 18
A regional market leader in direct financial services run several call centers across the United States and is opening a number of new call centers in the near future. The client uses Windows XP on dedicated workstations. The IT infrastructure consists of numerous HP ProLiant DL 360 G5 and HP ProLiant DL380 G6 servers running VMware ESX or SUSE Linux for the database server, direct attached storage, and HP Ultimatum tape drives. They want to consolidate the
infrastructure.
Which drawback of his environment can be eliminated when designing an HP StoreVirtual 4000 Storage solution?

A.    unexpected downtime caused by a site failure
B.    performance bottlenecks caused by mixed workloads
C.    inconsistent Oracle data caused by array snapshots
D.    capacity bottlenecks caused by duplicated data blocks

Answer: D

QUESTION 19
An insurance customer is planning to purchase an HP StoreVirtual SAN to support their large document management repository. They want to utilize Network RAID 6 to protect against multiple failures. What is the minimum number of nodes that must be included in the proposal to support this requirement?

A.    3
B.    4
C.    5
D.    6

Answer: B

QUESTION 20
A customer is concerned about backup data growth and maintaining or improvising restore service levels. The current environment consists of an HP StoreVirtual P4500 SAN solution, HP Data Protector, and an HP MSL4048 Tape Library with LTO-3 drives connected via SAS to the backup server.
You have been asked to design an upgrade to the current environment that will provide increased backup storage and improve backup retention and restore times. What should be proposed?

A.    Configure client-side deduplication in the backup software.
B.    Implement HP StoreEasy with block-level deduplication.
C.    Upgrade the MSL Tape Library to LTO-5 tape drives.
D.    Implement an HP StoreOnce Backup System.

Answer: C

If you want to pass HP HP0-J64 successfully, donot missing to read latest lead2pass HP HP0-J64 exam questions.
If you can master all lead2pass questions you will able to pass 100% guaranteed.

http://www.lead2pass.com/HP0-J64.html

         

Author: admin